Quayside Lodge

Link365 was delighted to work with CField Construction on several projects, with Quayside Lodge being one of them. We were proud to have completed this prestigious development in Fulham, South West London.

Quayside Lodge was a striking 10-storey mixed-use building with a single-storey basement. On completion, it delivered 110 residential units, office space at ground floor level, secure underground bicycle parking, and 51 car parking spaces.

Positioned on the water’s edge, the residential units benefited from breathtaking views of the Thames and London’s skyline.

This was a standout project, and we were proud to have brought our high-quality workmanship to such a notable London development alongside CField Construction.

Link365 Logo
Duration
54 weeks
No. of Modules / Units
110 Apartments
Service
Mechanical
Status
Completed

Mechanical Services

  • Air source heat pump base load installation
  • Daikin Altherma Ambient loop and indoor water to water heat pump units with integrated hot water cylinder
  • Heat metering
  • Fan coils system
  • Radiator systems
  • Frost protection/Trace heating
  • MVHRs ventilation installation
  • Sprinkler design and installation
  • Commercial sprinkler design and installation
  • Dry riser installation
  • Boosted cold water services and plant room
  • CAT 5 installation
  • Hot and cold-water services
  • Above ground rainwater collection and drainage installation
  • Sanitary ware installation
  • BMS – Building Management System
  • Fire rated ductwork
  • VRF and commercial ventilation installation
  • Testing and commissioning including chlorination and sterilisation
  • As built drawings
  • Operation and maintenance manuals

Challenges

The Quayside Lodge project required careful management of logistics, with all deliveries carried out on a strict ‘just in time’ basis. This approach was particularly important due to the plant room being located on the roof, which required close liaison with the Main Contractor and careful programming of plant lifts as soon as the roof area was completed.

To support progress, three designated storage areas were provided across the site. Individual heat pumps were installed directly into each apartment upon arrival to minimise the risk of damage. All commissioning activities were undertaken by specialist manufacturers, including individual heat pumps, communal heat pumps, and plant equipment. Overall, the project encountered minimal issues and progressed smoothly.

End of Project Reflection

Quayside Lodge was a fast-paced fit-out scheme involving a high volume of operatives. The project was delivered on time and within the agreed programme. Despite its complexity and the involvement of numerous specialist sub-contractors, the project ran efficiently through to handover.

This project once again demonstrates that Quayside Lodge fell well within Link365’s scope and capabilities. The team worked with precision and adaptability, ensuring successful delivery to client and contractor expectations. Link365 look forward to continuing our strong working relationship with CField Construction on future projects.

Link365 Logo

Essex Office
Suite 314, Sterling House, Langston Road, Loughton, Essex, IG10 3TS United Kingdom

Birmingham Office
Unit 2, Oughton Road, Birmingham, B12 0DF United Kingdom

Daikin Business Partner Logo

Daikin D1 Business Partner

Link365 is proud to be recognised by Daikin UK as a Certified D1 Installer Contractor. This accreditation is awarded to select partners who demonstrate consistent excellence in technical capability, installation quality, and customer service.

As a D1 Installer, we benefit from direct access to Daikin’s advanced technical support, extended warranties, and ongoing training ensuring that our clients receive industry-leading HVAC solutions backed by one of the world’s most trusted manufacturers. This partnership reinforces our commitment to delivering high-performance, energy-efficient systems across every project.