The Stage, Shoreditch EC2

The Stage will be a new, mixed-use development with a unique Shakespearean twist. Located in the heart of Shoreditch, this offering will include 412 luxurious apartments set within a 37-storey tower, over 400,000 sq. ft. of office, retail and leisure space, and a world-class heritage centre.

37 levels of dynamic landmark architecture and soaring elevations rising above one of the largest new public piazzas in London.

Highly specified suites, 1, 2 & 3 bedroom apartments and 4 bedroom duplex penthouses located adjacent to the brand new Amazon headquarters building, with up to 5000 employees. A showcase mixed use scheme of 412 luxurious apartments, prime office, retail and leisure space, together comprising over 540,000 sqft – designed around a world class heritage centre and public amphitheatre preserving the remains of Shakespeare’s Curtain Theatre.

Link365 was in charge of providing the full fit-out for the sales and marketing suite.As well as , conducting testing and commissioning for all electrical and mechanical services. Link365 was responsible for the installation of mechanical and electrical services, including hot and cold water services, and thermal insulation.

Galliard Homes Platinum
Link365 Logo
Duration
21 weeks
No. of Modules / Units
1 show apartment and marketing suite
Service
Mechanical
Status
Completed

Mechanical Services

  • Above ground drainage installation
  • Boosted cold water services
  • Hot and cold water services
  • Internal and external thermal insulation
  • Air handling unit/air source heat pump system installation
  • Extract ventilation and ducting system installation
  • Sanitary ware installation
  • Testing and commissioning including
  • chlorination and sterilisation
  • As built drawings
  • Operation and maintenance manuals

Electrical Services

  • New build wiring
  • Data cabling
  • Lighting control
  • Emergency lighting
  • Containment installation
  • Lighting design
  • Electrical testing
  • Access control
  • Automated gates & roller shutters
  • Audio & video intercom systems
  • Satellite systems
  • Induction loop
  • Fire alarm systems
  • Aspiration systems
  • AOV systems
  • Smoke ventilation
Link365 Logo

Essex Office
Suite 314, Sterling House, Langston Road, Loughton, Essex, IG10 3TS United Kingdom

Birmingham Office
Unit 2, Oughton Road, Birmingham, B12 0DF United Kingdom

Prompt Payment Code

Link365 is delighted to help enhance payment culture in the construction business. We have signed up for The Prompt Payment Code. This is a voluntary code of conduct for firms that encourages suppliers to pay within 30 to 60 days, depending on their size.

The aim of this is to help ensure that late invoices would hopefully become a thing of the past. Link365 abides by these set of principles for paying fairly and on time.