Skyline, Slough SL1

Skyline is a striking converted development situated within a five-minute walk from the High Street which boasts a variety of mostly independent retailers. Located just an 11 minute walk from Slough station and upcoming Crossrail (2019), residents will be able to travel direct into London in just 17 minutes via First Great Western trains.

Set within a former Fujitsu office building, Skyline offers a variety of contemporary studio, one & two-bedroom apartments. The main tower of 298 High Street rises to 11 floors, with reception areas and office space on the ground floor.

Link365 provided mechanical and electrical services for this project and oversaw the testing, installation, and commissioning of those services. The project was effectively finished in accordance with the schedule due to extensive planning and coordination from the team involved.

Duration
39 Weeks
No. of 

Modules / Units
90 studio's & apartments
Status
Completed

Mechanical Services

  • Above ground drainage installation
  • Rainwater alterations
  • Boosted cold water services & plant room
  • Hot and cold water services
  • Thermal insulation
  • Smoke extract ventilation installation
  • Ventilation & ducting system install – MEV / MVHR
  • Sprinkler installation
  • Dry riser alterations
  • Testing & commissioning incl. chlorination + sterilisation
  • As built drawings
  • Operation and maintenance manuals

Electrical Services

  • New build wiring
  • Data cabling
  • Lighting control
  • Emergency lighting
  • Containment installation
  • Lighting design
  • Electrical testing
  • Access control
  • Automated gates & roller shutters
  • Audio & video intercom systems
  • Satellite systems
  • Induction loop
  • Fire alarm systems
  • Aspiration systems
  • AOV systems
  • Smoke ventilation
  • Safecontractor
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram